Plate

AR steel for extreme, high-impact wear conditions

Ultimate chromium carbide plate for extreme wear resistance, durability, and moderate impact performance

Chromium carbide overlay wear plate

Monitoring

Color-coded indicators to make wear levels instantly visible

Industry-leading abrasion resistant pipe lasting up to 6x longer

Wear resistant pipe lasting up to 2x longer

Top-of-the-line couplings, flanges, weld rings, end grooves, and reducers

Rugged, customizable diversion valves for improved safety, efficiency, and reduced downtime

pipe

CASTINGS

Impact & abrasion resistant materials engineered for maximum wear life in your specific application.

Bar & Pin

Triloy alloy shafting bar for unmatched strength, machinability, and durability

Special treated pins for ultimate wear resistance and toughness

Welding Consumables

Superior joining for high-strength metals

Versatile welding solution for high-strength and corrosion-resistant metals

Economical hard-facing alloy for balanced impact and abrasion resistance

Superior metal-cored welding for exceptional impact and abrasion resistance

Premium chromium carbide welding for exceptional wear resistance

HARD CORE EXCELLENCE IN BIRMINGHAM, ALABAMA

We’re excited to recognize James Champion for setting a record in paint spraying productivity!
 
James recently achieved an outstanding milestone by spraying more paint in a single day than ever before recorded. His dedication, precision, and work ethic were on full display as he pushed the limits of what’s possible in our operations.
 
This accomplishment not only reflects James’s personal commitment to excellence but also sets a new benchmark for performance and efficiency in our painting process.
 
Congrats, James!
We’re proud to announce that Tommy Byars has been selected as the recipient of the Hardcore Excellence Award for the month of September!​
 
Tommy demonstrated exceptional initiative and innovation by developing a new process for welding overlay on the face of conveyor screws in the flat position.
 
Using three welders and two positioners, Tommy reengineered the approach to a job that would typically take a month to complete out of position.​
 
Thanks to his ingenuity and hard work, Tommy completed the overlay in just two weeks—entirely on his own.​
 
This achievement not only showcases Tommy’s technical skill and problem-solving mindset but also sets a new benchmark for efficiency and excellence in our operations.​
 
Congratulations, Tommy! Your dedication and creativity continue to inspire us all.